WA Blower Door
Home
Residential Testing
Commercial Testing
Schedule A Test
Contact Us
Multi-Fan Testing
WA Blower Door
Home
Residential Testing
Commercial Testing
Schedule A Test
Contact Us
Multi-Fan Testing
More
  • Home
  • Residential Testing
  • Commercial Testing
  • Schedule A Test
  • Contact Us
  • Multi-Fan Testing

  • Home
  • Residential Testing
  • Commercial Testing
  • Schedule A Test
  • Contact Us
  • Multi-Fan Testing

Air Leakage Testing for Bigger Buildings

One fan can't move enough air for an apartment building or a commercial shell. We set up multiple fans together, run them as one test, and give you numbers your inspector can use. Call (253) 802-8738.

Ask About Your Building

Multifamily and townhomes

Apartment buildings and townhome blocks that need a whole-building air barrier test.

Mixed-use and commercial

Small commercial and mixed-use buildings, tested under the Washington State Energy Code.

Retests after air sealing

Sealed up the leaks and need to prove it? We come back and run it again.

When one fan isn't enough

A single-family house usually tests fine with one blower door. Larger floor plates, taller buildings, and leakier shells need more airflow to reach test pressure.

That's where dual-fan and multi-fan setups come in: fans in one doorway or spread across several, all logged together.

Common projects: multifamily and townhome blocks, mixed-use and small commercial buildings, whole-building air barrier tests under the Washington State Energy Code, and retests after air sealing.

What test day looks like

We walk the building with your super and confirm what's sealed, taped, or left open. Fans go into the door frames, with gauges and hoses run to each one.

Logged together

One laptop, one clock

Leak hunting

While the building is under pressure

Written report

For the permit file

Before you call

It helps to have a few numbers from your plans or spec. Not sure which standard applies? Ask. We'll sort it out with you or your design team.

Ask About Your Building

Square footage

Total floor area of the building.

Number of stories

Taller buildings need more airflow.

Test standard

Listed on your plans or spec.

Have a larger project coming up?

Send us your plans or call (253) 802-8738.

Same office in Sumner: PE stamp and envelope design through Dow Engineering PLLC. Email office@wablowerdoor.com.

Ask About Your Building

Copyright © 2026 WA Blower Door  - All Rights Reserved.

Our family: Dow Engineering, Build Sherpas. Same office in Sumner.

Powered by Sustainable Energy

  • Terms and Conditions

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept